What "Turnkey" Should Mean on the Invoice
Turnkey is the most abused word in this industry. Used properly it means one number covers everything between signing and load-out: design and 3D rendering, fabrication, graphics production, round-trip freight, installation and dismantle, and the show paperwork that catches exhibitors out — EAC filings, certificates of insurance, electrical orders and drayage coordination.
Used loosely, it means the structure and nothing else, with freight, drayage, labour and electrical arriving as separate invoices weeks after the show. That second version is where exhibitors get hurt, because the extras are billed by the venue's official contractor at rates you cannot negotiate once you are on the floor. When you compare rental quotes, the only fair comparison is line item against line item.
Pick the Footprint Before You Pick a Design
The most common sequencing error is falling for a rendering and then trying to make it fit the space you actually booked. Footprint drives everything downstream: how many staff you can hold without the booth feeling crowded, whether you can run scheduled demos, whether a private conversation is possible, and whether a hanging sign is permitted.
The 20x20 island at 400 sq ft is the real change point — four open aisles, sightlines from every direction, and the first size where meeting space becomes practical. Above 20x40 you are buying programming capacity rather than square footage, and the design question becomes what the space is for rather than what fits in it. The full grid of sizes against the cities we ship to sits on the booth rental hub.
What Moves the Number
Two exhibitors at the same footprint can be quoted very differently. The drivers, in rough order of impact:
- City and venue. Freight distance from our warehouse, local labour rules and the venue's drayage tiers. Las Vegas sits at the bottom of the range because we are local; New York and New Jersey run roughly double.
- Structure type. Modular systems with fabric graphics sit at the bottom; bespoke joinery, architectural ceilings and hardwood flooring at the top.
- Enclosed space. Meeting rooms and storage cost more per square foot than open floor — real walls, doors and acoustic treatment.
- Screens and AV. Monitor count, LED walls, sound systems and on-site AV operation during show hours.
- Timeline. Rush builds compress production and carry a premium.
Renting Versus Buying
Buying makes financial sense when you run roughly five or more shows a year, your brand identity is settled for the next three to five years, and someone internally owns storage, refurbishment and freight between events. Below that, the maths usually favours renting — not only on cash flow, but because a purchased booth starts looking dated halfway through its useful life and refurbishment is rarely as cheap as the original business case assumed.
There is a middle path most exhibitors overlook: rent while you are still learning what works at your shows, then buy once you know which layout actually generates conversations. Committing capital before you have run a design twice is how companies end up owning an exhibit they quietly dislike.
The Build Schedule
For major shows, book 14 to 18 weeks out. That allows for design approval, graphics production, a full pre-build at our Las Vegas warehouse, and freight transit with slack for weather and marshalling-yard queues. Ten to twelve weeks is workable for regional shows. Below that you are into rush territory — possible from ready-to-ship inventory, but with narrower design options.
The pre-build step is the one worth insisting on with any supplier. A booth already assembled and inspected in a warehouse is being replicated on the show floor, not built there for the first time under deadline. It is also the point where you see photographs of the real structure while there is still time to change something. Working backwards from a specific date, the show directory is the fastest way to check venue and timing.
- Send the show name, hall and booth number first — venue and labour jurisdiction drive every downstream date.
- Confirm who files the EAC and who carries the COI. It sounds like paperwork trivia; it is what stops a crew getting badge access on install day.
- Confirm your drayage tier before the booth is crated, not after. A crate fifty pounds over a threshold can cost more than the graphics inside it.
- Order electrical, rigging and internet through the show 4 to 6 weeks out to avoid on-site rates.
- Lock graphics at final output size early — reprints are the most common rush cost.
- Build the runsheet before graphics lock, so counters and monitors land where the traffic actually is.











