A sign in three tiers
The hanging sign stacks three rings over the island: the Glenmark and IGI logos, “A new way for a new world”, and “Advancing innovation in next gen biologics”.
Rigging went in first, on 27 May. The challenge: the rigging orientation needed correcting on the floor, and the crew reset it before the sign was raised.
On 28 and 29 May the structure, the meeting room and the LED screens went up. The LED orientation was tested on site before any content ran.
The planters were filled with real plants. Furniture and plants were cleaned and kept up through the show, and the island was handed over at 12:36 pm on 29 May.













